It is so rewarding when you can look back at the week of work you did and actually SEE a difference. This week was one of progress . . . visible progress . . . which is so much more encouraging than the non-visible progress that seemed to go on forever.
At the beginning of the week, we continued to do a bit of framing. I framed out the attic opening, which was rather simple. At the end of last week I also worked on getting the second staircase ready. Mr.W laid out the stringers and I created them. They are made a little differently than the main staircase since there are no spindles on this staircase. I made the stringers and cut most of the treads and then Mr.W and Jay finished it off on Monday morning when I took a quick trip to the border to pick up a faucet. When I arrived around 12:30, the staircase was up. It is so nice to have that second set of stairs. They go from the garage straight up to the office so that when Jay has meetings with various businessmen, they can go straight to the office and not come through the house. That way our life can continue without us interrupting them or them interrupting us. They also framed out the walls around that stairway. Most of the framing is now done with just another couple small walls to go before it is finally complete.
Since all the structural framing is complete, the inspector came by and had a look. It is, indeed, deeply satisfying when you frame a 1600 sq.ft main floor and a 2000 sq.ft second floor (never mind all the work required on the 1600 sq.ft basement) and the inspector says he can see nothing wrong and can tell we really paid attention to the details! Woot, woot for us!!
Since most of the framing is done and the inspector made his appearance, we have moved on to insulating the walls. What a fantastic job to do if you want immediate progress. It is so easy to see what you have done - put up one piece and you can see your work. In only one afternoon, we insulated the whole upstairs! The neat part is the kids can really help with this step. The boys and RJ eagerly jumped into helping - they put full batts of insulation in the lower half of the walls and we did the top sections. With a little adjusting of their work, it is perfect. This is one area they really enjoy helping and don't seem to grow tired of it. We just don't have enough bottom-half-of-the-walls for all of them to help for long. They get way ahead of us but their help is greatly appreciated anyway. It is fairly humorous to watch our 3 year-old Ari put on a mask upside down, wear gloves 6 sizes too large and attempt to install the insulation. I love the willing hearts! Now Mr.W has already finished putting up the poly in a couple of the rooms so we are chugging along quite nicely.
While I was inside putting up the insulation with Mr.E and the kids, Jay was 67 feet up in the air (his words, which, incidentally, always grew each time we talked - he doesn't much like heights) wrapping up the house with Typar. Last night we stood back and looked at the house all wrapped up and he put his arm around me and told me that since I was a gifts person, he just finished wrapping my gift, complete with red tuck tape. I think it is one of the most beautiful gifts ever (well, next to my husband and children).
MB Hydro also showed up to install our new hydro poles (for those of you not familiar with our power source, we here in this prairie province of Canada receive our electricity via water power. Therefore, our electricity is usually referred to as hydro so the hydro poles are the poles that hold the electric lines.). I was gone during that time but the kids had great fun watching. They said it was very loud. It must have made quite the impact on AJ because he has now crafted a similar vehicle set-up out of his Lego.
I mentioned we ran into a snag with our rake head window. It was supposed to be a 6/12 pitch and it was a 5/12 pitch. It was a combination of my mistake and the window company's mistake. Since they take no responsibility for it (I did sign off on it) and will not give us any money for it in return, we installed it anyway. We just need to modify the lounge ceiling to match the window pitch. Should be easy. We also installed the two garage windows today so all that remains to be installed is the office window.
We also spent some time doing more shopping/research for items for the house. We researched fireplaces a long time ago and now placed our order. We have also ordered the 2 corner showers we need (1 for Jay's bathroom and 1 for our bathroom), bought the recessed lighting we will start installing next week, bought the range hood vent so it can be ducted, bought other lighting and bought our laundry sink. I also learned that Mr.W has done concrete counter tops in the past and would like to do it again. He didn't know that I have talked about concrete counter tops for at least a year and would love to try it in our kitchen. Sounds like a plan may be forming!
The plumbing and heating rough-in continues to progress and this time the boys got to be Papa's helpers. They did a great job!
Today the drywall crew came to check out the site and do a sheet count. They said that everything looks really good so that is another encouragement. They see many houses and are familiar with the trade. I take their compliment to heart.
Finally, before you think this whole building job is about me, I assure you it is not. Sure, I help out each day but the real hero, in my eyes, is Jay. He is an unbelievably hard working guy. Today he started off the morning at the hog barn, working out some kinks there then he came to work on the house. In the afternoon he went to the chicken barn to work out the kinks there then came back to the house. Now he is mowing the grass here. He is the "little-engine-that-could", the energizer bunny, if you will. He just keeps going and going and going. Building this house is his job for these few months. He has "laid himself off" from his other full-time jobs (though he still manages the hog operation and a couple of chicken barns) in order to put full days of work here at the house. His wages are waaaay down from a normal year. These are the types of sacrifices he willingly makes for our family and I am so honored to be taking this journey with him. ♥ you, sweetheart!
Showing posts with label Nana and Papa. Show all posts
Showing posts with label Nana and Papa. Show all posts
Saturday, August 11, 2012
Saturday, July 28, 2012
Owner Building a Home - Day 51 & 52 - First Floor Windows, Etc.
DAY 51
For the first time in a very long while we had a cloudy, misty, almost kinda rainy day. But that is okay! With the heat wave we have been having a day like this is welcomed. It would have been nice to actually get more rain (maybe not the 3.5" a nearby town got) since the fields could use it and a rain day away from the house is welcome, too. However, work continued. If you look at the photos of when the roof went on, you notice the sheeting on the roof is missing at the peaks. There is also no sheeting connecting the roofs over the house and the roof over the garage. This day saw Mr.W on the roof filling in those missing pieces. Like I said, he is the only one with safety training for working on the roof while being anchored down with a rope so we gladly handed everything to him and let him at it. He cut the sheeting before I got there then I handed it up to him through the trusses while standing on a ladder. Once again I state how much easier it is to build a roof on the ground. The bill we got for craning it up is totally worth not having to do all this up-and-down-the-ladder-must-tether-to-the-roof stuff. After the sheeting was down, the shingles went up. Those also had to be carried up a ladder, one bundle at a time. I don't have enough padding on my shoulders so Mr.G got to carry them while Mr.W installed them. It is a tiring job working up on that tall roof!
While he was shingling, he also added the roof vents on the backside of the roof. So now the roof is watertight and can vent. The temperature in the house has lowered dramatically to a very comfortable temperature, especially with the breeze coming through the window openings. While Mr.W was up on the roof, we continued to finish back framing and a whole bunch of other little things that just need doing. We needed to move back the stair header to give us more headroom and to bring it up to code. That stair header is only about 3 feet wide and has two LVL hangers attached to it. Each of those hangers has 40 nails in it. Times that by 2 and you have 80 nails that I was supposed to pull out while working with my arms above my head. Can you only imagine how tired my arms were? And I only did 20 nails. That was all I could do! They were not easy to pull and required more strength than I had left. When Jay showed up, I gladly gave him the job and he finished the remaining 60 nails in about half the time it took me to do 20. Sometimes my lack of strength hinders me and that frustrates me. However, my arms are WAAAAAY more tone than they were before so these past few couple of months have certainly helped in that regard. We needed to add a nailing surface for the drywall in the vaulted ceiling and in the tray ceiling. See, boring stuff that needs to get done but everything looks the same afterwards. That is okay. I enjoyed being given a list and then just going at it. Each of these little jobs are so important. I added the insulation and vapor barrier and OSB around the tub opening in the kids bathroom so we can install that tub already so our plumber knows where the drain is. We also brought in our corner tub but since the stair header was in the way, we couldn't get it up the stairs. Towards the end of the day, Jay pushed more soil up by the front door so we can get started on the front porch sometime next week, maybe. Sometimes progress seems really slow because you cannot see what you did but it is progress none-the-less.
DAY 52
Shingling and sheeting continued today so most of the roof is now watertight. There are a couple of small sections but those will be done soon. Once again, it was Mr.W up there and we are so glad he is! Then, just before lunch, the guys put in the first window! Of course, they picked the largest window in the house, the living room picture window, which then makes it the heaviest, but you have to start somewhere! Mr.W explained how windows are installed and then they put it in. The kids and my mom and I all watched, the guys put it in and the kids cheered!When you are looking at windows and figuring out what you want, you are not always sure how it is going to look. I LOVE our windows and am so glad I went with the style I did. After lunch they put in almost all the remaining main floor windows - only one kitchen window is still out. They look so good but I imagine with the rest of the siding and a large 6" white trim, they will look FANTASTIC!
Any ideas of what the front door will look like?! The entry system will not be installed until much closer towards the end of building to ensure it doesn't get damaged but let me tell you, it is BE.U.T.FUL!!
We continued to work on little "renovations" here and there to adjust window openings to their exact right location, to make room for heating ducts and generally make sure all the framing is just where it needs to be. My dad was out with our family friend ("Uncle" Junior) to continue working on the plumbing and heating. He often had questions about where sinks would be or what kind of faucets, how high the sinks were, etc. so I had to figure out some of those answers to make sure everything gets put in the exact right spot. AJ joined Papa (my dad) up in the trusses to put together some pipes - AJ was so thrilled to be able to help.
![]() |
| I misplaced my camera at this moment so this is with Jay's phone |
Labels:
AJ,
DIY,
J and I,
Nana and Papa,
Project 2012
Saturday, April 23, 2011
Easter at Nana & Papa's
Easter is such an important celebration around here as we remember the death and sacrifice of Jesus, the Christ, our Savior and our Redeemer. That redemption, of course, is only possible because of his resurrection and I look forward to tomorrow when I can say with utmost certainty (well, I can say it all the time, not just tomorrow) that HE'S ALIVE and I'm forgiven!! Amen and amen!
Part of the celebrations of this weekend included a trip to Nana & Papa's place, who happen to be my parents. They live about 40 minutes away so we don't get over there all that often but it is always a whole lot of fun when we do! That Papa sure loves to tease our kids and they sure love to play with him!
After a wonderful meal, Papa hid the Easter bags and the kids went hunting!


Maybe next time Papa should hide AJ's bag in a slightly lower location :)

After the treats were found, eggs were decorated! I don't have any photos since I was busy helping the boys to make tie-dye eggs and the girls to make sparkle eggs (Papa sure picked some great decorating kits and was helping out the whole time!). Then after the eggs, the kids needed a play break so Papa's motorcycle became the jungle gym for a bit! I am sure there will need to be a bit of polishing after all those little fingers were all over it!


Then the Easter bread (Paska) had to be decorated. Traditionally, when my dad was a little boy, the paska was baked in tin cans instead of bread pans. That way each child received their own round mushroom-shaped paska. This year my mom indulged the memories of my dad's childhood and baked him and each of the grandkids their own paska in a tin can. They each iced the bread and sprinkled it full of sprinkles. I must say that eating it is the best part!





After everyone else had gone home, out came the water and the kids chased Papa (or Papa chased the kids) in a water fight! So much laughing and running! Papa is such a big kid at heart and it makes the kids love him even more! The memories they will take with them through life will always be of a Nana and Papa that loved them very much and showed it in such fun and memorable ways. Thanks, mom and dad, for showing the love of that Risen Savior to our children each and every time we see you! I love you!
Labels:
Easter,
Nana and Papa,
the boys,
the girls
Subscribe to:
Posts (Atom)